Topographic, hydrological and geotechnical field surveys, preliminary and final engineering design of 45 km of arterial and local roads including the associated utility systems, preliminary and final design of 4 diamond interchanges and 3 highway bridges, design of a directional sign system around the International Stadium, design of vehicle-actuated traffic signal installations, construction supervision.